top of page

PEM’s School Board Playground Update

9 hours ago
1 min read

PEM’s School Board on Nov. 9 approved a proposal from Bolton & Menk, Inc., Rochester-based engineering consultants, to complete a topographic survey and preliminary location evaluation for the planned all-inclusive ‘Playground of PawsAbilities’ at the PEM PreK-3 building in Plainview.


Accoring to the Plainview News, the company will document existing site conditions and provide a planning-level review of two playground locations identified by school staff to help determine whether they appear feasible for further design.


Bolton & Menk will complete a topographic survey of the area containing two potential playground locations and adjacent ground needed to evaluate grading, drainage, and connections to existing walks and school facilities.


It will coordinate with school staff to confi­rm survey limits, site access, and available playground footprint information.


Bolton & Menk will complete the topographic survey and limited preliminary grading and location evaluation for a fixed fee of $2,500.

 

Comments


bottom of page