According to the Minnesota Department of Transportation, motorists in in Goodhue, Wabasha and Winona counties will encounter delays this summer as they continue their bridge crack and joint sealing project.
Â
Crews will be working Monday through Saturday during daylight hours. Lane closures with flagging operations or a pilot car for traffic control will occur in most work zones.
Â
Bridges scheduled for sealing work include:
Highway 52 bridges at Hader, northbound bridge over the North Fork Zumbro River, south junction of Highway 60
Highway 60 over the Mississippi River at Wabasha
Highway 61 bridges near Kellogg
Highway 60 bridge west of Zumbro Falls
Highway 61 bridges near Minnesota City
Highway 43 bridges over the Mississippi River in Winona
Highway 74 bridge near Elba
It is anticipated that work should be completed in September.
Â
Â
Â
コメント